ABOUT PROJECT
New primary school and a new home for the elderly in the area of Gothenburg were developed. The activities are combined in one and the same building where the school includes grades F-6 for 400 students and the nursing home 100 places. /Hemsö/
ART8 team installed linoleum, PVC and PVC free flooring, as well as installed rised floor system and installed industrial parquet and oak cube floor. All works were performed within 10 months. For subfloor preperation ART8 team used Bostik compounds, but For installation and treatment of parquet were used Bona materials.