ABOUT PROJECT
The reconstruction of the factory building, built at the turn of the 19th and 20th centuries, and the construction of the building took place on the site where several factories once operated, until it was taken over by the State Electrotechnical Factory or VEF in 1928.
The ART8 team assembled the raised floor in the amount of more than 5600 m2.